• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ACCELERATOR LINKAGE BULKHEAD FLANGE REPLACEMENT - Continued
THROTTLE CONTROL HANDLE ASSEMBLY REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  562    563    564    565    566  567  568    569    570    571    572  
img
. . . .
TM 5-5420-226-20-2
THROTTLE CONTROL HANDLE ASSEMBLY REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
7-366
7-367
Cleaning and Inspection
Installation
7-368
TOOLS:
9/16 in. socket with 1/2 in. drive
7/16 in. combination box and open end wrench
1/2 in. drive ratchet handle
Ball peen hammer
Slip joint pliers
1/4 in. drive punch
Vise
SUPPLIES:
Clean rags (Item 12, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
REMOVAL:
1.
Using 7/16 inch wrench, remove
four screws (A), lockwashers (B)
and flat washers (C).
2.
Position bracket (D) away from
throttle control handle (E).
Go on to Sheet 2
7-366


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.