TM 5-5420-226-20-2
TRANSMISSION SHROUDS REPLACEMENT (Sheet 5 0f 8)
Right intermediate Shroud Replacement (Sheet 5 0f 5)
5.
I n s t a l l c a b l e assembly
(E) through intermediate
shroud (A).
6.
Route cable assembly(E)
7.
Using spanner wrench, connect cable assembly (E) connector to generator (F) connector.
8.
Install grommet (G) around cable assembly (E) and into intermediate shroud (A).
9.
End of Task
TA107981
9-26