• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE SHROUD REPLACEMENT
ENGINE SHROUD REPAIR OFF ENGINE

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  692    693    694    695    696  697  698    699    700    701    702  
img
. .
TM 5-5420-226-20-2
ENGINE SHROUD REPLACEMENT (Sheet 2 0f 2)
INSTALLATION:
Position engine shroud (A) on powerplant.
1.
Using socket, install twenty screws, washers, and lockwashers (B) securing engine shroud
2.
(A) to powerplant.
Using torque wrench, tighten twenty screws (B) to 20-27 lb-ft (27-37 NZm).
3.
Using cross-tip screwdriver, install two screws and lockwashers (C) securing engine
4.
shroud (A) to powerplant.
Install transmission shroud (page 9-6).
5.
install top deck (page 16-23).
6.
TA107986
End of Task
9-31


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.