• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION SHROUDS REPLACEMENT - Continued
ENGINE SHROUD REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  690    691    692    693    694  695  696    697    698    699    700  
img
. . . . .
TM 5-5420-226-20-2
TRANSMISSION SHROUDS REPLACEMENT (Sheet 8 of 8)
Left Intermediate Shroud Replacement (Sheet 1 of 1)
TOOLS:
1/2 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
1/2 in. combination box and open end wrench
PRELIMINARY
PROCEDURES:
Remove powerplant (page 5-2)
Remove oil filler (upper) tube (page 6-84)
REMOVAL:
1.
Using socket and wrench, remove screw, lockwasher, and nut (A).
2.
U s i n g wrench or socket, remove seven screws and washers (B) securing intermediate
shroud (C) to engine.
Remove intermediate shroud (C).
3.
INSTALLATION:
1.
Position intermediate shroud (C) into place, on engine.
2.
Install seven screws and washers (B) to secure intermediate shroud (C) to engine.
Install screw, lockwasher, and nut (A).
3.
Using wrench and socket, tighten screws (A and B).
4.
5.
Install engine oil filler tube (page 6-86).
6.
Install powerplant (page 5-14)
TA107984
End of Task
9-29


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.