• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE SHROUD SUPPORT REPLACEMENT - Continued
TURBOCHARGER SHROUDS REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  702    703    704    705    706  707  708    709    710    711    712  
img
. . . . . . . . .
TM 5-5420-226-20-2
TURBOCHARGER SHROUDS REPLACEMENT (Sheet 1 of 6)
PROCEDURE INDEX
PAGE
PROCEDURE
9-41
Inner Shroud Replacement
9-45
Outer Shroud Replacement
9-46
Upper Shroud Replacement
PAGE
PROCEDURE
9-41
Removal
943
Installation
1
TOOLS:
1 1 / 1 6 in. combination box and open end wrench
l / 2 i n . combination box and open end wrench
l/2in. socket with l/2 in. drive
5in. extension with l/2in. drive
Ratchet with l/2in. drive
R e m o v e powerplant (page 5-2)
PRELIMINARY
PROCEDURES:
Remove rear engine shroud support (page 9-39)
Remove transmission oil cooler lines (page 6-64 or 6-68)
Go on to Sheet 2
TA107996
9-41


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.