Home
Download PDF
Order CD-ROM
Order in Print
Right front swivel hook assembly
Right fluid pump cover - TM-5-5420-278-10_148
TM-5-5420-278-10 M85 Tank Chassis Transporting: for Bridge Armored-Vehicle-Launched Scissoring Type Class 80 Manual
Page Navigation
107
108
109
110
111
112
113
114
115
116
117
Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-21
39
During
Front
transverse
upper coupling
(7) and
receptacle
blocks (6)
Check for proper operation and
structural damage.
Damage prevents
coupling from
proper operation
or seating in
receptacle.
38
During
Right front
longitudinal
upper
coupling (4)
and receptacle
blocks (5)
Check for proper operation and
structural damage.
Damage prevents
coupling from
proper operation
or seating in
receptacle.
4
6
7
6
5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business