TM-5-5420-279-10
4.8.3.7
Lift the A-frame supports and rotate them down to their stowed position.
4.8.3.8
Reconfigure the decking and walkway panels above the slide frame for parallel
4.8.3.9
Remove the two guardrails from the A-frame folding walkways and place them on the
walkway below the launch frame.
Figure 4.9 Slide Frame Decking Positions for
Bridge Build
4-46