TM-5-5420-279-10
4.9.1.10
Retrieve the two lifting slings and sling the end beam, refer to Figure 4.10. Each sling
is to be attached around the beam at the bridge lifting points to ensure a straight lift.
Tail lift Fully Deployed
CAUTION
To prevent damage to the lifting slings it is important that care is exercised when
connecting the slings to the crane hook. Ensure that the sling is fitted correctly and does
not become trapped by the hook safety clip.
4.9.1.11
Attach both slings to the crane hook.
4.9.1.12
Connect a tag line to the far bank end beam by passing a loop of rope through the
pinning hole and securing with the snap hook.
4-49