TM-5-5420-279-10
5.4.5.49
Fit four transportation aides to the parallel module, two per side, in between the deck
units as shown in Figure 5. 4. The four transportation aides being place between the
deck units through which the closing slings are accessed. The four transportation
aides are fitted with the white face up and facing outwards.
5.4.5.50
Disconnect the single leg sling.
5.4.5.51
Secure loads to flatracks V2 and T2 in preparation for recovery to staging area.
Flatrack Repositioning
5.4.6.1
Drive vehicle V2 to bridge site and load flatrack V2, return flatrack V2 to the staging
area.
5.4.6.2
Drive vehicle V1 to bridge site and load flatrack T2, return flatrack T2 to the staging
area and transload flatrack onto trailer T2.
5.4.6.3
With vehicle V3 load flatrack LVT and return to bridge site. Ground load flatrack LVT
in position.
Position of Flatrack
Recovering the Far Bank Ramp Module
5.4.7.1
Operate the lift and traverse controls on the crane to position the crane hook ready
for attachment to the far bank ramp module push/pull sling.
5.4.7.2
Connect the crane hook to the far bank ramp module push/pull sling.
CAUTION
Equipment damage. Do not extend the jib sufficient to cause damage to the launch beam
pin storage rack.