TM-5-5420-279-10
35
Lower the launch beam and far bank support on to the far bank.
36
Remove flatrack LVT from the build site.
37
Position and unstrap flatracks V2 and T2 on the build site.
38
Stow the articulator cylinders.
39
Raise the A-frame.
40
Stow the A-frame support struts.
41
Reconfigure the walkways to bridge build configuration.
42
Deploy the tail-lift.
43
Deploy the tilt rollers.
44
Add the 4 Removable rollers and the end beam guides.
45
Place the end beam on the guides.
46
Add the far bank ramp and pin.
47
Add the ramp lead brackets to the front face of the ramp.
48
Add the approach ramps to the far bank ramp.
49
Attach the crane push/pull sling.
50
Lower the end beam guide arms and push the far bank ramp with the crane.
51
Attach the far bank ramp to the far bank carriage.
52
Detach the crane push/pull sling.
53
Remove the end beam guides and the removable rollers.
54
Add a parallel module.
55
Boom forward and release the bridge stops emergency.
56
Boom to the white C of G marker, using the roller brakes and tilt roller; angle the
bridge to the launch beam.
57
Continue to boom using the tilt rollers and the lower bridge stops emergency.
58
Add the second parallel module.
59
Boom forward while holding the tilt roller joystick forward.
60
Release the bridge stops emergency only to allow the jaws to pass.
61
Boom until the jaws are over the center of the tail-lift.
6-4