TM-5-5420-279-10
8
Turn the rotary switch in the cab to position 2.
9
Lower the tail-lift.
10
Remove the crane pads and the step ladder.
11
Unstrap the far bank support.
12
Remove the A-frame hinge locking pins.
13
Unfold the A-frame.
14
Pin the A-frame at the 4 hinge points.
15
Remove the far bank support feet from their stowed position.
16
Extend the far bank support.
17
Rotate the A-frame and insert the shootbolt.
18
Add the far bank support feet.
19
Release the twist locks.
20
Remove the A-frame stabilizer pins.
21
Extend the stabilizers to clear launcher of the launch vehicle chassis and pin
stabilizer legs.
22
Turn the rotary switch in the cab to position 3.
23
Fully extend the slide frame.
24
Connect the chest pack.
25
Turn the rotary switch in the cab to position 4.
26
Retract the relax mechanism shootbolts.
27
Deploy the A-frame walkways and ladders for launch beam build configuration.
28
Deploy the crane and crane spreader pads.
29
Position and unstrap flatrack V1 and T1 on the build site.
30
Check and level the A-frame using the A-frame stabilizer legs.
31
Set the beam angle.
32
Remove the launch beam final stop.
33
Build the launch beam.
34
Insert the launch beam final stop.
6-3