TM-5-5420-279-10
Recovering the Launch vehicle after Bridge Recovery
Position of Flatrack
5.4.8.1
Using vehicle V3, load flatrack T1, return it to the staging area and transload flatrack
T1 onto trailer T1.
5.4.8.2
Return vehicle V1 to the build site and recover flatrack V1, return it to the staging
area.
5.4.8.3
Using vehicle V3, load flatrack LVT, return it to the staging area and transload
flatrack LVT onto trailer LVT.
5.4.8.4
In the staging area load vehicle V3 with load V3.
5.4.8.5
Retrieve the removable walkways from their stowed position and position in
accordance with beam build.
5.4.8.6
Refer to the steps in Chapter 4 Section V Para 4.14 through 4.15.1.22 inclusive to
recover the launch beam.
5.4.8.7
Refer to the steps in Chapter 4 Section VI Para 4.17 through 4.18.2.22 inclusive to
recover the launch vehicle.
5.4.8.8
Connect all trailers to their respective vehicles and ensure all loads are secure prior
to transport back to base.
5.4.8.9
Refer to Para 5.2 Driving the Launch Vehicle and PLS trucks With or Without
Trailers Attached, and observe speed limits.