TM 5-5420-280-10
OPERATOR INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
MANUALLY REMOVING LOAD DURING LHS HYDRAULIC POWER LOSS
NOTE
This procedure is used to remove load from transporter
with a failed LHS hydraulic system or other failure that
prevents operation of LHS.
Each transporter is equipped with one hose assembly
stowed in left-hand stowage box on transporter. Two
hose assemblies (one from each vehicle) are required.
1. Position transporters so LHS control boxes on both transporters are side by side.
2. Shut off engines on both transporters.
NOTE
Refer to Transporter Hose Flow Diagram Figure for
steps 3 through 7.
TRANSPORTER WITH
TRANSPORTER WITH
Transporter Hose Flow Diagram Figure.