• Google+Share on Google+
    • FacebookShare on Facebook
    • LinkedInShare on LinkedIn
    • TwitterShare on Twitter
    • DiggShare on Digg
    • StumbleUponShare on StumbleUpon
    • Home
    • Download PDF
    • Order CD-ROM
    • Order in Print
    PALLET WIRING AND HARNESSES REPLACEMENT - Continued
    PALLET MAIN POWER SWITCH REPLACEMENT - Continued

    Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
      339    340    341    342    343  344  345    346    347    348    349  
    img
    . . . . .
    TM 5-5420-280-23&P
    0054 00
    PALLET MAINTENANCE INSTRUCTIONS
    RAPIDLY EMPLACED BRIDGE (REB)
    NSN 5420-01-481-3959 P/N 12480471
    PALLET MAIN POWER SWITCH REPLACEMENT
    REMOVAL, INSTALLATION
    INITIAL SETUP:
    Tools and Special Tools
    Equipment Condition
    Forward Repair System (FRS)
    Bridge halves removed from bridge pallet.
    (Table 1, Item 2, WP 0206 00)
    Refer to WP 0018 00.
    Battery ground cable disconnected.
    Refer to WP 0113 00.
    0054 00-1


    Privacy Statement
    Press Release
    Contact

    © Copyright Integrated Publishing, Inc.. All Rights Reserved.