• Google+Share on Google+
    • FacebookShare on Facebook
    • LinkedInShare on LinkedIn
    • TwitterShare on Twitter
    • DiggShare on Digg
    • StumbleUponShare on StumbleUpon
    • Home
    • Download PDF
    • Order CD-ROM
    • Order in Print
    PALLET MAIN POWER SWITCH REPLACEMENT - Continued
    NATO SLAVE RECEPTACLE REPLACEMENT - Continued

    Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
      341    342    343    344    345  346  347    348    349    350    351  
    img
    . . . . . .
    TM 5-5420-280-23&P
    0055 00
    PALLET MAINTENANCE INSTRUCTIONS
    RAPIDLY EMPLACED BRIDGE (REB)
    NSN 5420-01-481-3959 P/N 12480471
    NATO SLAVE RECEPTACLE REPLACEMENT
    REMOVAL, INSTALLATION
    INITIAL SETUP:
    Tools and Special Tools
    Equipment Condition
    Forward Repair System (FRS)
    Bridge halves removed from bridge pallet.
    Refer to WP 0018 00.
    (Table 1, Item 2, WP 0207 00)
    Battery ground cable disconnected.
    Materials/Parts
    Refer to WP 0113 00.
    Two lockwashers (WP 0199 00)
    Gasket (WP 0199 00)
    0055 00-1


    Privacy Statement
    Press Release
    Contact

    © Copyright Integrated Publishing, Inc.. All Rights Reserved.