• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE ALTERNATOR REPLACEMENT
ENGINE ALTERNATOR REPLACEMENT - Continued

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  530    531    532    533    534  535  536    537    538    539    540  
img
. .
TM 5-5420-280-23&P
0106 00
ENGINE ALTERNATOR REPLACEMENT (Contd)
REMOVAL
NOTE
Tag all leads for installation.
1.
Remove three screws (20), belt and pulley guard (19), and three spacers (18) from front of
engine (11).
2.
Loosen nut (6), capscrew (2), pivot alternator (17) to loosen, and remove alternator belt (3).
3.
Remove nut (6), lockwasher (5), washer (4), and capscrew (2) from alternator (17) and bracket (10).
Discard lockwasher (5).
4.
Remove nut (9), lockwasher (8), and power cable (7) from alternator stud (12) on alternator (17).
Discard lockwasher (8).
5.
Remove nut (13), lockwasher (14), and cable (15) from alternator stud (16) on alternator (17).
Discard lockwasher (14).
6.
Support alternator (17) and remove capscrew (1) and alternator (17) from engine (11).
INSTALLATION
1.
Install alternator (17) on engine (11) with capscrew (1).
2.
Install cable (15) on alternator stud (16) of alternator (17) with new lockwasher (14) and nut (13).
3.
Install power cable (7) on alternator stud (12) of alternator (17) with new lockwasher (8) and
nut (9).
4.
Install bracket (10) on alternator (17) with capscrew (2), washer (4), new lockwasher (5), and nut (6).
Finger tighten nut (6).
5.
Install alternator belt (3) on alternator (17) and engine (11) pulleys. Pivot alternator (17) to tighten
alternator belt (3) and tighten nut (6).
6.
Install three spacers (18) and pulley guard (19) on front of engine (11) with three screws (20).
7.
Connect battery ground cable. Refer to WP 0113 00.
8.
Install bridge halves on bridge pallet. Refer to WP 0018 00.
0106 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.