TM 55-1945-205-10-4
0015 00 8
0015 00
ASSEMBLING CAUSEWAY
:,1*
All personnel must wear personal a flotation device, hard hat, safety shoes and
gloves during FC operations and maintenance. Failure to observe these precautions
could result in serious injury or death to personnel.
Place the hands on top or on the outside of ropes/lines so that in an emergency the
lines can be released quickly to preclude being pulled in the equipment. Failure to
observe these precautions could result in serious injury or death.
&,21
Surf conditions and swells are independent of open water Sea State conditions. If
wave height exceed five foot swells, operations should be curtailed. If the surf
conditions sustain five foot swells for an extended period of time, the FC should be
towed to a safe harbor. Failure to comply could result in equipment damage.
1.
Assemble the required number of intermediate sections.
2.
Maneuver intermediate sections together, with beach/sea end toward the shore line, using warping tugs,
ropes/lines, flush turn tubes and lift lugs so that the tapered surfaces of male and female shear connectors mate
together in general alignment.
CAUSEW AY SEGM ENT
INTERM EDIATE
SECTIO NS
BEACH/SEA END
SECTIO N