TM 55-1945-205-10-40015 00 120015 002.Beaching FC using duck ponds.a.To ensure the beach/sea end of FC fully penetrates the beach during high tide, bulldozers create a duck pond during low tide with minimum dimensions of 2 ft deep by 30 ft wide by 70 - 90 ft in length. b.Two WTs, secured on each side of FC last section and operating under full power, beach/stab FC into duck pond. c.Bulldozers fill in cavity surrounding perimeter of beach/sea end, displacing remaining water in duck pond.3.Deploy onshore mooring legs. (WP 0034 00)4.Deploy offshore mooring legs. (WP 0033 00)END OF WORK PACKAGE