TM 55-1945-10-4
0016 00 1
0016 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
FORCE OPENING
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Crowbar (Item 14, WP 0104 00)
Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)
Personnel Required
Seaman 88K
Equipment Condition
Module ISOPAK Disassembled. (WP 0008 00)
Operation Of Male And Female Connectors. (WP 0009 00)
D-ring/cloverleaf Fittings And Deck Cleat Fittings Installed. (WP 0010 00)
Module String Assembled. (WP 0011 00)
Intermediate Section Assembled. (WP 0012 00)
Combination Beach/Sea End Section Assembled (WP 0013 00)
PREPARATION FOR USE - ASSEMBLY OF FORCE OPENING FLOATING CAUSEWAY
ASSEMBLE PIERHEAD
:,1*
All personnel must wear a personal flotation device, hard hat, safety shoes and
gloves during FC operations and maintenance. Failure to observe these precautions
could result in serious injury or death to personnel.
Place the hands on top or on the outside of ropes/lines so that in an emergency the
lines can be released quickly to preclude being pulled into the equipment. Failure to
observe these precautions could result in serious injury or death.
1.
Assemble required number of intermediate strings together side by side, using rope/lines, flush turn tubes, deck
cleats, and warping tug so tapered surfaces of male and female connectors mate together in general alignment, to
form pierhead.