TM 55-1945-205-24-2
0310 00 1
0310 00
DIRECT SUPPORT MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
RIGID HULL INFLATABLE BOAT ENGINE IGNITION COIL
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Item 81, WP 0359 00)
Materials/Parts
Assembly, Coil
(80256)
PN 582508
Personnel Required
Engineer 88L
References
TM 55-1945-205-10-2
Equipment Condition
RHIB Dry-Docked.
RHIB Engine Cover Removed. (WP 0297 00)
RHIB Battery Negative Lead Terminal Removed. (WP 0336 00)
REMOVE RHIB ENGINE IGNITION COIL
NOTE
The following procedure is typical for the removal and installation of RHIB
engine ignition coils.
Tag and disconnect spark plug wire (1) from
ignition coil
assembly (2).
1.
Remove two mounting screws (3), ground washers (4) and mounting washers (5) securing the
ignition coil
assembly (2) to the rear and starboard side of the engine.
2.
Remove coil assembly (2) and discard.
2
5
4
3
1