• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR CLEANER (ARMORED) CENTRIFUGAL FAN POWER LEAD REPLACEMENT - Continued
AIR CLEANER (ALUMINUM) CENTRIFUGAL FAN POWER LEAD REPLACEMENT

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  259    260    261    262    263  264  265    266    267    268    269  
img
. . .
TM 5-5420-202-20-2
AIR CLEANER (ARMORED) CENTRIFUGAL FAN POWER LEAD REPLACEMENT (Sheet 3 of 3)
INSTALLATION:
1.
Connect two leads (A) and (B) to centrifugal
fan circuit breakers and position the
following parts on lead (C): nut (D), washers
(E) and (F), gasket (G).
Install lead (C) through adapter (H). Pull
2.
approximately 10 inches of lead out of
adapter.
Install shell (J) approximately 2 inches over
3.
end of lead (C) and install washer (K).
Pull shell (J) toward end until it is stopped
4.
by washer (K).
Push gasket (G) and washers (E) and (F)
5.
into adapter (H).
6.
Thread nut (D) onto adapter (H). Use slip
joint pliers and tighten nut.
Install air cleaner centrifugal fan
7.
cover (page 7-105).
Connect electrical connectors (L).
8.
Check operation of air cleaner
9.
(TM 5-5420-202-10).
10.
Close top grille doors (TM 5-5420-202-10).
End of Task
7-79


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.