• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ACCELERATOR THROTTLE LINKAGE REPLACEMENT - Continued
ACCELERATOR LINKAGE ENGINE CONTROL REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  519    520    521    522    523  524  525    526    527    528    529  
img
.
TM
5-5420-202-20-2
ACCELERATOR LINKAGE ENGINE CONTROL REPLACEMENT (Sheet 1 of 2)
9/16 in. socket with 1/2 in. drive
TOOLS:
5 in. long extension with 1/2 in. drive
1/2 in. drive ratchet
7/16 in. combination wrench (2 required)
1/2 in. combination wrench
Gloves (Item 69, Appendix D)
SUPPLIES: Clean rags (Item 12, Appendix D)
Goggles (Item 70, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
Pencil (Item 71, Appendix D)
Paper (Item 72, Appendix D)
PRELIMINARY PROCEDURE: Remove operator's seat backrest (page 17-54)
Remove engine upper access cover (page 17-11)
Go on to Sheet 2
7-322


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.