• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE WIRING HARNESS (DUST DETECTOR) REPLACEMENT - Continued
DUST DETECTOR HULL INTERMEDIATE LEAD ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  418    419    420    421    422  423  424    425    426    427    428  
img
. . . .
TM 5-5420-202-20-3
DUST DETECTOR HULL INTERMEDIATE LEAD ASSEMBLY REPLACEMENT
(Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
10-298.8
10-298.10
Installation
TOOLS:
7/16 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
Pliers, diagonal cutting
Pliers, slip joint
SUPPLIES:
Lockwashers (4 required)
Strap, tie wrap (as required)
PRELIMINARY PROCEDURE: Disconnect three battery ground straps (page 10-268)
REMOVAL:
1.
Using slip joint pliers, disconnect starter cable (A) at bulkhead connector (B).
Go on to Sheet 2
10-298.8
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.