• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFT LINKAGE ADJUSTMENT - Continued
SHIFT LINKAGE ADJUSTMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  517    518    519    520    521  522  523    524    525    526    527  
img
TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 9 of 28)
39.
Go to right rear of vehicle and try to insert
locating pin into alinement hole (C) and
through clevis (AA). If locating pin can
be inserted, shift linkage is in adjustment.
Remove locating pin and go to step 126.
If locating pin cannot be inserted, go on
to step 40.
Try to insert locating pin (L) into alinement
40.
holes in support (AB) and link (AC). If
locating pin (L) can be inserted, remove
locating pin (L) and go to step 67. If locating
pin (L) cannot be inserted, go on to step 41.
41.
Using 9/16 inch wrench, loosen jamnuts
(AD) and (AE).
42.
Using 9/16 inch wrench, remove screw (AF)
and remove shifting rod bearing end (AG)
from clevis (AC).
43.
Using hands move clevis (AC) and insert locating
pin (L) into alinement holes in support (AB)
and link (AC).
Go on to Sheet 10
TA249326
11-60


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.