• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HUB ASSEMBLY REPLACEMENT - Continued
HUB ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  764    765    766    767    768  769  770    771    772    773    774  
img
TM 5-5420-202-20-3
HUB ASSEMBLY REPLACEMENT (Sheet 5 of 7)
Using hammer and drift punch, install new (if
4.
required) bolts (D) into hole (E) of hub (B).
Grease new preformed packing (F). Install packing into groove on arm assembly (G).
5.
Install seal assembly (H) with new gasket (J) onto arm (G) lower spindle.
6.
Pack both inner (K) and outer bearings (L) with grease.
7.
Position inner bearing (K) on arm (G) lower spindle.
8.
Install hub (B) onto arm spindle (G), making sure seal assembly (H) alines to five pins on interface
9.
of arm assembly (G).
10. Install eight screws (M) and lockwashers (N) to secure seal assembly (H) to hub (B).
11. Using 9/16 inch socket, tighten screws (M) alternately.
12. Install outer bearing (L) onto spindle. Push hub (B) onto spindle and bearing until bearing seats.
13. Install round nut (P) with dowel. Using spanner wrench with 3/4 inch drive ratchet, tighten nut (P)
while rotating hub one way then opposite.
GO on to Sheet 6.
14-19
Change 4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.