TM 5-5420-209-12Table 2-11. Operator Preventive Maintenance Checks and Services (PMCS) for the Ramp Bay cont.LocationInterval ‘Item To be InspectedEquipment Is NotItem toProcedureReady/Available IfService/Check8BeforeTagline BarInspect for broken welds and deformation.9BeforeUnfoldingInspect cover plate, spring pins, pins, lever,Broken welds noted orMechanismand link for cracks, broken welds anddeformation preventsdeformation.mechanism forfunctioning properly.NOTECable, when adjustedcorrectly, will be taut NOTtight.10BeforeUnfolding Cable Inspect for kinks, compression, flat surfaces,Cable kinked,and broken or frayed strands.compressed, flattened orstrands broken.11BeforeLifting EyeInspect for cracks and elongation of eye.Any cracks noted or eye(Front)elongation equals 25%of originalcircumference.12BeforeUnfolding Cable Inspect for kinks, compression, flat surfaces,Cable kinked,and broken or frayed strands.compressed, flattened orstrands broken.NOTEEnsure latch and receptacleare adjusted properly (latch"T" rests snugly against strikecatch of correspondingreceptacle).13BeforeBridge LatchInspect brackets, supports and pins for cracks,Cracks, broken weldsbroken welds and deformation.noted or deformationcauses binding.Inspect springs for deformation and stretching.Springs stretched.14BeforeTravel LatchInspect brackets, supports and pins for cracks,Cracks, broken weldsbroken welds and deformation.noted or deformationcauses binding.Inspect springs for deformation and stretching.Springs stretched.15BeforeTravel LatchInspect brackets, shims and strike catches forBroken welds, binding orReceptaclecracks, broken welds, binding anddeformation preventsdeformation.engaging latch.16BeforeCable GuideInspect for cracks, gouges, jagged protrusions, Eye cracked, elongatederosion of surface area and elongation of eye.more than 0.50 at upperarc or aluminum erodedto within .050.2-28
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business