ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(7)Add third heavy nose section.(8)Remove panel pin from nose roller and move nose toward launching nose cross girder. Nose has to be guidedinto rollers. Stop movement when anchorage tube of second heavy nose section is aligned with holes in noseroller.(9)Place panel pin through nose roller and anchorage tube and secure with retainer clip.(10) Move landing roller pedestal toward bankseat beam until base of landing roller pedestal is within 9 in (23 cm) ofbankseat beam. Ensure landing roller pedestal is centered under launching nose.(11) Add remaining heavy nose sections (including double story nose if required). Do not move launching nose intolaunching nose cross girder.NOTEThe remaining nose sections may be added during delaunch depending on site conditions. If nosesare to be added during delaunch, always maintain minimum 5ft safety distance n front of LRP.(12) Add light launching nose front and rear.4-48
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business