ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(3)
Place high position hook in carrying bar bracket of top panel and low position hook in deck rail of top panel. This
will hold the link in the high position during building and booming.
(4)
When the link is to be lowered to its "low" position, personnel are standing along one girder, two at each light
tackle. All the personnel in unison lift the link to disengage the high position hook, then lower the link and place
the low position hook in the carrying bar bracket. The link is now ready for tensioning.
d.
Fitting Anti Flutter Tackle
Two Anti-Flutter tackle are connected to each link girder as close to the mid-point of the bridge as possible.
(1)
Place one toggle bar into each outer hole in reinforcing link. Push down and turn through 900 (1/4 turn) to lock
toggle bar in link.
4-62