ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(11) Put footwalk posts in holes of footwalk bearers.(12) Put hook of guard rope in carrying bar bracket of bay 6 bottom panel. Feed rope through bottom hooks of bothposts. Form a bight in rope at sway brace bracket of bottom panel 5 and secure bight in bracket with bracing pin.Feed rope through top hooks of posts. Put hook of guard rope in carrying bar bracket of bay 6 top panel. Thehigh side of the rope should be behind the operator when operating the post tensioner puller, therefore the highside of the rope will always be toward the center of the bridge.4-60
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business