ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(7)Connect long link from anchor assembly to link connecting block with the nose pin removed at step (5). Securewith retainer clip.(8)Timber packing (3 in x 8 in x 84 in), previously on cross girder, will now be positioned on the ground in line withthe bridge girder, to act as a skid and assist in assembling of links. Connect second long link to post tensioningassembly link connecting block with nose pin. Secure with retainer clip. Feed the link under the roller beamcross girder unless site conditions determine it must be fed between the cross girder and roller beam.4-58
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business