ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(5)Remove retainer clip from the nose pin holding the post to the frame. Push upwards on the post to enablethe nose pin to be removed, then lower the post. This nose pin will be used to connect the anchorassembly long link to the post [step (7)].(6)Remove retainer clip and nose pin securing sliding block in frame. Use this pin to secure block once posthas been tensioned. Until needed this pin is stored in bottom panel of bay 5. Place puller handle in bottompanel of bay 5.4-57
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business