ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 6-10. Delaunch Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS) (Normal Site)
Bridge ft
108
114
120
126
130
Length m
32.9
34.8
36.6
38.4
40.2
2E + No of Bays
13
14
15
16
17
L/Nose
6N1
7N1
7N1
7N1
8N1
Counterweight
-
-
-
-
V Distance
ft
110
117
123
128
134.8
m
33.5
35.7
37.5
39
41.1
Build
Notes a thru c
Notes a thru c
Notes a thru c
Notes a thru c
Notes a thru c
Delaunch
10p6
11p6
12p6
13p6
14p6
Add
FRB,RRB
FRB,RRB
FRB,RRB
FRB,RRB
FRB,RRB
Delaunch
(6p2)
(6p4)
(7p1)
(7p5)
(8p0)
Recover
LRP
LRP
LRP
LRP
LRP
Boom
11p0
11p0
1p0
11p0
10p7
Remove
E,13,12
E,14,13
E,15 thru 13
E,16 thru 13
E,17 thru 13
(CG)
(4p0)
(4p2)
(4p2)
(4p2)
(3p7)
Boom
4p4
4p7
4p7
4p7
4p5
Remove
11,10,9
12 thru 10
12 thru 10
12 thru 10
12 thru 10
(CG)
(2p3)
(2p5)
(2p5)
(2p5)
(2p3)
Boom
3p0
3p2
3p2
3p2
3p0
Remove
8,7,6
9 thru 7
9 thru 7
9 thru 7
9 thru 7
(CG)
(Ap2)
(1p0)
(1p0)
(1p0)
(Ap2)
Boom
1p2
1p2
1p2
1p2
1p2
Remove
5
6,5
6,5
6,5
6,8N1**
6N1*,4
7N1*,4
7N1*,4
7N1*,4
5
3,2
3,2
3,2
3,2
7N1*,4
3,2
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E
1,E
Completed by
Note d
Note d
Note d
Note d
Note d
NOTES:
a.
Remove all curbs, ramps, and deck units.
b.
Position CRB under bridge min. 1.5 ft (0.5 m) from end.
c.
Add LNCG posts, LNCG and nose roller and install launching nose, observing minimum 5 ft (1.5 m)
overhang..
d.
Disassemble FRB and RRB. Clear site.
**
Remove 8th LNH or all of 3N2 (double-story nose).
*
Remove given length of launching nose, LNCG, LNCG posts and nose roller.
( )
Center of gravity.
6-13