ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-10. Delaunch Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS) (Normal Site)Bridge ft108114120126130Length m32.934.836.638.440.22E + No of Bays1314151617L/Nose6N17N17N17N18N1Counterweight----V Distanceft110117123128134.8m33.535.737.53941.1BuildNotes a thru cNotes a thru cNotes a thru cNotes a thru cNotes a thru cDelaunch10p611p612p613p614p6AddFRB,RRBFRB,RRBFRB,RRBFRB,RRBFRB,RRBDelaunch(6p2)(6p4)(7p1)(7p5)(8p0)RecoverLRPLRPLRPLRPLRPBoom11p011p01p011p010p7RemoveE,13,12E,14,13E,15 thru 13E,16 thru 13E,17 thru 13(CG)(4p0)(4p2)(4p2)(4p2)(3p7)Boom4p44p74p74p74p5Remove11,10,912 thru 1012 thru 1012 thru 1012 thru 10(CG)(2p3)(2p5)(2p5)(2p5)(2p3)Boom3p03p23p23p23p0Remove8,7,69 thru 79 thru 79 thru 79 thru 7(CG)(Ap2)(1p0)(1p0)(1p0)(Ap2)Boom1p21p21p21p21p2Remove56,56,56,56,8N1**6N1*,47N1*,47N1*,47N1*,453,23,23,23,27N1*,43,2BoomBp2Bp2Bp2Bp2Bp2Remove1,E1,E1,E1,E1,ECompleted byNote dNote dNote dNote dNote dNOTES:a.Remove all curbs, ramps, and deck units.b.Position CRB under bridge min. 1.5 ft (0.5 m) from end.c.Add LNCG posts, LNCG and nose roller and install launching nose, observing minimum 5 ft (1.5 m)overhang..d.Disassemble FRB and RRB. Clear site.**Remove 8th LNH or all of 3N2 (double-story nose).*Remove given length of launching nose, LNCG, LNCG posts and nose roller.( )Center of gravity.6-13
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business