ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-11. Delaunch Table - 2E + 18 through 2E + 22 Bay Double Story (w/o LRS) (Normal Site)Bridge ft138144150156162Length m42.143.945.747.649.42E + No of Bays1819202122L/Nose8N16N1+3N26N1+3N26N1+3N26N1+3N2Counterweight-[20D+6C][20D+6C][20D+6Cl[20D+6C]V Distanceft141158.5161163165m43.048.349.149.750.3BuildNotes a thru cNotes a thru cNotes a thru cNotes a thru cNotes a thru cDelaunch15p516p517p518p519p5AddFRB,RRBFRB,RRBFRB,RRBFRB,RRBFRB,RRBDelaunch(8p4)(9p0)(9p7)(10p3)(10p7)RecoverLRPLRPLRPLRPLRPBoom10p711p011p011p011p0RemoveE,18 thru 13[6C+20D],E[6C+20D],E[6C+20D],E[6C+20D],E19 thru 1420 thru 1421 thru 1422 thru 14(CG)(3p7)(4p0)(4p0)(4p0)(4p0)Boom4p54p24p24p24p2Remove12 thru 1013 thru 1013 thru 1013 thru 1013 thru 10(CG)(2p3)(2p0)(2p0)(2p0)(2p0)Boom3p02p42p42p42p4Remove9 thru 79 thru 79 thru 79 thru 79 thru 7(CG)(Ap2)(Bp2)(Bp2)(Bp2)(Bp2)Boom1p21p21p21p21p2Remove6,8N1**6,3N2**6,3N2**6,3N2**6,3N2**555557N1*,44,6N1*4,6N1*4,6N1*4,6N1*3,23,23,23,23,2BoomBp2Bp2Bp2Bp2Bp2Remove1,E1,E1,E1,E1,EComplete byNote dNote dNote dNote dNoteNOTES:a.Remove all curbs, ramps, and deck units and add counterweight if required.b.Position CRB under bridge min. 1.5 ft (0.5 m) from end.c.Add LNCG posts, LNCG and nose roller and install launching nose, observing minimum 5 ft (1.5 m) overhang.d.Disassemble FRB and RRB. Clear site.**Remove 8th LNH or all of 3N2 (double-story nose).*Remove given length of launching nose, LNCG, LNCG posts and nose roller.[ ]Counterweight.( )Center of gravity.6-14
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business