ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 6-12. Delaunch Table - 2E + 1 through 2E + 6 Bay Double Story
(Normal Site - Original Far Bank)
Bridge ft
36
42
48
54
60
66
Length m
11.0
12.8
14.6
16.5
18.3
20.1
2E + No. of Bays
1
2
3
4
5
6
L/Nose
2N1
3N1
3N1
3N1
4N1
4N1
V Distance
ft
38
45
51
55.8
63
69
m
11.6
13.7
15.5
17.0
19.2
21.0
Build,
Notes a,b,c
Notes a,b,d
Notes a,b,d
Notes a,b,d
Notes a, b
Notes a,b,
d,e
d,e
Delaunch
Dp2
Dp2
Dp2
Dp2
Dp2
Dp2
Add
RRB
RRB
RRB
RRB
RRB
RRB
Delaunch
(1p0)
(1p2)
(1p6)
(2p3)
(2p5)
(3p1)
Recover
LRP
LRP
LRP
LRP
LRP
LRP
Boom
1p3
1p6
2p4
3p0
3p0
4p0
Remove
E
E
E
E
E
E
(CG)
(Bp7)
(Bp5)
(Bp0)
(Ap1)
(1p2)
(1p6)
Boom
3p0
Remove
6,BP5
(CG)
(1p0)
Boom
1p7
1p7
1p7
1p7
Remove
2N1*
3N1*
3N1*
BP4
TP5,BP4
TP5,BP4
Pin at A
Pin at A
3N1*
4N1*
4N1*
BP2
BP3
(CG)
(Bp3)
(Bp1)
(Ap2)
(1p3)
(1p3)
(1p3)
Boom
2p0
2p0
2p0
Remove
Pin at A
Pin at A
Pin at A
Boom
1p4
1p4
1p4
1p4
Remove
TP3, BP2
TP4
TP4
TP4
3,BP2
3,BP2
3,BP2
Boom
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
Remove
1
TP2,1
TP2,1
TP2,1
TP2,1
TP2,1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
E
E
E
E
E
E
Complete By:
Note f
Note f
Note f
Note f
Note f
Note f
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge min 1.5 ft (0.5 m) from end.
b.
Position center of LR (LRP) 8 ft (2.4 m) from BSB. Add LNCG posts, LNCG and nose roller.
c.
For 2E + 1 only. Add 2 LNH and LLN rear section. Re-position LRP [base 9 in (23 cm) from BSB].
d.
For 2E + 2 through 2E + 12. Add 3LNH. Re-position LRP [base 9 in (23 cm) from BSB].
e.
Add remaining nose sections, observing minimum 5 ft (1.5 m) overhang.
f.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose roller.
( )
Center of gravity.
6-15