ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 6-17. Delaunch Table - 2E + 5 through 2E + 6 Bay Double Story (Restricted Site)
Bridge ft
60
66
Length m
18.3
20.1
2E + No. of Bays
5
6
L/Nose
5N1
6N1
5N1
6N1
V Distance
ft
63
63
69
69
m
19.2
19.2
21.0
21.0
Build
Notes a,b,
Notes a,b,
Notes a,b,
Notes a,b,
c and d
c and d
c and d
c and d
Delaunch
5p4
5p4
6p4
6p4
Remove
E
E
E
E
Delaunch
4p4
4p4
5p4
5p4
Remove
5
5
6
6
Delaunch
3p4
4p4
Remove
4
5
Delaunch
2p4
3p4
Remove
3
4
Delaunch
2p4
Remove
3
Delaunch
2p4
1p4
3p4
1p4
Add
RRB
RRB
RRB
RRB
Delaunch
(Bp0)
(Cp4)
(1p0)
(Cp4)
Recover
LRP
LRP
LRP
LRP
Boom
2p2
2p6
Remove
4
5
(CG)
(Bp0)
Boom
1p5
2p4
Remove
3
4
(CG)
(Cp1)
(Bp4)
Boom
1p2
1p2
1p2
1p2
Remove
5N1*
6N1*
5N1*
6N1*
2
2
3,2
2
Boom
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E
Complete By:
Note e
Note e
Note e
Note e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge min 1.5 ft (0.5 m) from the end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3 LNH. Reposition LRP [base 9 in (23 cm) from BSB].
d.
Add remaining nose sections, observing minimum 5 ft (1.5 m) overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose roller.
( )
Center of gravity.
6-20