ARMY TM 5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 6-16. Delaunch Table - 2E + 1 through 2E + 4 Bay Double Story
(Restricted Site)
Bridge ft
36
42
48
54
Length m
11.0
12.8
14.6
16.5
2E + No. of Bays
1
2
3
4
L/Nose
3N1
4N1
4N1
4N1
5N1
V Distance
ft
39
45
51
57
63
m
11.9
13.7
15.5
17.4
19.2
Build
Notes
a,b,c,d
Notes
a,b,c,d
Notes
a,b,c,d
Notes
a,b,c,d
Notes a,b,c,d
Delaunch
1p4
2p4
3p4
4p4
4p4
Remove
E
E
E
E
E
Delaunch
2p4
3p4
Remove
3
4
Delaunch
2p4
Remove
3
Delaunch
Bp1
1p4
1p4
2p4
1p4
Add
RRB
RRB
RRB
RRB
RRB
Delaunch
(Cp1)
(Bp7)
(Bp7)
(Ap2)
(Cp1)
Recover
LRP
LRP
LRP
LRP
LRP
Boom
2p4
Remove
4
(CG)
(Bp2)
Boom
1p7
Remove
3
(Bp7)
Boom
1p3
1p6
1p2
1p2
1p2
Remove
3N1*
4N1*
4N1*
4N1*
5N1*
2
2
2
2
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
1,E
1,E
1,E
1,E
1,E
Complete By:
Note e
Note e
Note e
Note e
Note e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge min 1.5 ft (0.5 m) from the end.
b.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3 LNH. Reposition LRP [base 9 in (23 cm) from BSB].
d.
Add remaining nose sections, observing minimum 5 ft (1.5 m) overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose roller.
( )
Center of gravity.
6-19