ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-15. Delaunch Table - 2E + 18 through 2E + 22 Bay Double Story (w/o LRS)(Normal Site - Original Far Bank)Bridge ft138144150156162Length m42.143.945.747.649.42E + No of Bays1819202122L/Nose8N16N1+3N26N1+3N26N1+3N26N1+3N2Counterweight-[20D+6C][20D+6C][20D+6C][20D+6C]V Distanceft141158.5161163165m43.048.349.149.750.3Buildnotes a thru cnotes a thru cnotes a thru cnotes a thru cnotes a thru cDelaunch15p516p517p518p519p5AddFRB+RRBFRB+RRBFRB+RRBFRB+RRBFRB+RRBDelaunch(8p4)(9p0)(9p7)(10p3)(10p7)RecoverLRPLRPLRPLRPLRPBoom8p69p210p110p511p1RemoveE thru BP13[6C+20D][6C+20D][6C+20D][6C+20D]E thru BP13E thru BP1 3E thru BP13E thru BP13(CG)(4pl)(3p6)(3p6)(3p6)(3p6)Boom4p44p04p04p04p0RemoveTP13 thruTP13 thruTP13 thruTP13 thruTP13 thruBP10BP10BP10BP10BP 10(CG)(2p4)(2p2)(2p2)(2p2)(2p2)Boom2p62p42p42p42p4RemoveTP10 thru BP7TP10 thru BP7TP10 thru BP7TP10 thru BP7TP10 thru BP7(CG)(1p0)(Bp0)(Bp0)(Bp0)(Bp0)Boom1p71p71p71p71p7RemoveTP7 thru BP5TP7+BP6TP7+BP6TP7+BP6TP7+BP68N1**+BP43N2**3N2**3N2**3N2**7N1’*TP6 thru BP4TP6 thru BP4TP6 thru BP4TP6 thru BP46N1*6N1*6N1*6N1*(CG)(1p3)(1p3)(1p3)(1p3)(1p3)Boom2p02p02p02p02p0RemovePin at APin at APin at APin at APin at ABoom1p41p41p41p41p4RemoveTP4 thru BP2TP4 thru BP2TP4 thru BP2TP4 thru BP2TP4 thru BP2BoomBp0Bp0Bp0Bp0Bp0RemoveTP2,1TP2,1TP2,1TP2,1TP2,1BoomBp2Bp2Bp2Bp2Bp2RemoveEEEEECompleted byNote dNote dNote dNote dNote dNOTES:a.Remove all curbs, ramps, and deck units and add counterweight if required.b.Position CRB under bridge min 1.5 ft (0.5 m) from the endc.Add LNCG posts, LNCG and nose roller and install launching nose, observing minimum 5 ft (1.5 m) overhang.d.Disassemble FRB and RRB. Clear site.**Remove 8th LNH (after BP5), or all of 3N2 (after BP6).*Remove given length of launching nose, LNCG, LNCG posts and nose roller.[ ]Counterweight.( )Center of gravity.6-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business