ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-14. Delaunch Table - 2E + 13 through 2E + 17 Bay Double Story (w/o LRS)(Normal Site -Original Far Bank)Bridge ft108114120126132Length m32.934.836.638.440.22E + No of Bays1314151617L/Nose6N17N17N17N18N1V Distanceft110117123128134.8m33.535.737.53941.1BuildNotes a thru cNotes a thru cNotes a thru cNotes a thru cNotes a thru cDelaunch10p611p612p613p614p6AddFRB,RRBFRB,RRBFRB,RRBFRB,RRBFRB,RRBDelaunch(6p2)(6p4)(7p1)7p5(8p0)RecoverLRPLRPLRPLRPLRPBoom6p46p67p37p78p2RemoveE thru BP12E thru BP13E thru BP13E thru BP13E thru BP13(CG)(4p1)(4p4)(4p4)(4p4)(4p1)Boom4p44p64p64p64p4RemoveTP12 thru BP9TP13 thruTP13 thruTP13 thruTP13 thruBP10BP10BP10BP10(CG)(2p4)(2p7)(2p7)(2p7)(2p4)Boom2p63pl3pl3pl2p6RemoveTP9 thru BP6TP10thruBP7TP10thruBP7TP10thruBP7TP10thruBP7(CG)(1p0)(1p2)(1p2)(1p2)(1p0)Boom1p71p71p71p71p7RemoveTP7 thru BP4TP7 thru BP4TP7 thru BP4TP7 thru BP4TP7 thruBP56N1*7N1*7N1*7N1*8N1**+BP47N1*(CG)(1p0)(1p3)(1p3)(1p3)(1p3)Boom2p02p02p02p02p0RemovePin at APin at APin at APin at APin at ABoom1p41p41p41p41p4RemoveTP4 thru BP2TP4 thru BP2TP4 thru BP2TP4 thru BP2TP4 thru BP2BoomBp0Bp0Bp0Bp0Bp0RemoveTP2,1TP2,1TP2,1TP2,1TP2,1BoomBp2Bp2Bp2Bp2Bp2RemoveEEEEECompleted byNote dNote dNote dNote dNote dNOTES:a.Remove all curbs, ramps, and deck units.b.Position CRB under bridge min 1.5 ft (0.5 m) from the endc.Add LNCG posts, LNCG and nose roller and install launching nose, observing minimum 5 ft (1.5 m) overhang.d.Disassemble FRB and RRB. Clear site.**Remove 8th LNH (after BP5), or all of 3N2 (after BP6).*Remove given length of launching nose, LNCG, LNCG posts and nose roller.( )Center of gravity.6-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business