• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE OIL COOLER REPLACEMENT - Continued
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (LEFT SIDE) TEST AND REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  62    63    64    65    66  67  68    69    70    71    72  
img
. . . . . .
TM
5-5420-226-20-2
ENGINE OIL COOLER REPLACEMENT (Sheet 6 of 6)
Using 3/4 inch socket and torque wrench tighten
18.
valve (M) to no more than 150 lb-in. (17 Nm).
Install new washer on screw (N).
19.
Using 1/2 inch socket, install screw (N).
20.
Check engine oil level indicator gage rod.
21.
(TM 5-5420-226-10)
Replenish lubricating oil lost during oil cooler
22.
r e p l a c e m e n t .  (LO 5-5420-226-12)
Connect engine for powerplant ground hop
23.
(page 5-25).
Start and run engine. Check for oil leaks at
24.
oil cooler and line connections.
Shut down engine. Disconnect engine from
25.
powerplant ground hop (page 5-25).
Install engine shroud (page 9-31).
26.
27.
Install powerplant (page 5-14).
End of Task
TA107494
6-24


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.