TM 5-5420-226-20-2
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE)
TEST AND REPLACEMENT (Sheet 5 of 6)
6.
Using ruler, measure overall length of valve. Write down overall length of valve.
`?.
Compare measurements written down at room and at heated temperatures.
8.
Using low-pressure compressed air, dry valve.
NOTE
After heating, valve length must have increased by 1/4 inch minimum. If
valve length increased less than 1/4 inch, throw valve away. Obtain new
valve and repeat test. If new valve passes test, install it.
INSTALLALLTION:
1.
Install new spacer ring (A) on valve
(B).
2.
Using hands, install valve (B) to trans-
mission oil cooler.
3.
Using automotive wrench, tighten valve
(B).
4.
Using 1-5/8 inch wrench, install
5.
Using hands, install tube end fitting
(D) on adapter (C).
6.
Go to other end of tube (E).
Go on to Sheet 6
TA107506