TM 5-5420-226-20-2
TRANSMISSION OIL COOLER REPLACEMENT (Sheet 1 of 10)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS: 1/2 in. socket with 3/8 in. drive
6 in. extension with 3/8 in. drive
1/2 in. combination wrench
3/4 in. combination wrench
1-5/8 in. combination wrench
Screwdriver
SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section 1).
SUPPLIES:
Drip pan
1/2 in. masking tape (Item 58, Appendix D)
Plastic barrier material (Item 42, Appendix D)
Rags (Item 12, Appendix D)
Cover for turbosupercharger air inlet port
.
REFERENCES:
PRELIMINARY PROCEDURES:
Go on to Sheet 2
TA107508