• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE) TEST AND REPLACEMENT - Continued
TRANSMISSION OIL COOLER REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  75    76    77    78    79  80  81    82    83    84    85  
img
. . . .
TM 5-5420-226-20-2
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE)
TEST AND REPLACEMENT (Sheet 6 of 6)
At other end of tube (E) using 1-1/2 inch
7.
wrench, install tube end fitting (F) on
adapter (G).
Using 1-1/2 inch wrench, tighten tube
8.
end fitting (D) at oil cooler.
Using 1-5/8 inch wrench, install adapter
9.
(H).
10.
Using hands, install tube end fitting (J)
on adapter (H).
11.
Go to other end of tube (K) and using
1-1/2 inch wrench, install tube end fitting
(L) on adapter (M).
12.
Using 1-1/2 inch wrench, tighten tube
end fitting (J) at oil cooler.
13.
Replenish oil lost during valve assembly
replacement (LO 5-5420-226-12).
14.
Remove rags from transmission and oil
cooler.
15.
Start and run engine (TM 5-5420-226-10).
Check for oil leaks.
Install engine shroud (page 9-31).
16.
17.
Install transmission shroud (page 9-6).
End of Task
TA107507
6-37


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.