• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CRANKCASE BREATHER TEE AND REAR TUBE REPLACEMENT - Continued
MULTIPLE FLUID PRESSURE LINE CONNECTOR REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  141    142    143    144    145  146  147    148    149    150    151  
img
. . . . . .
TM 5-5420-226 -20-2
MULTIPLE FLUID PRESSURE LINE CONNECTOR REPLACEMENT (Sheet 1 of 6)
PROCEDURE INDEX
PAGE
I
PROCEDURE
6-101
Removal
6-103
Inspection
6-103
Installation
TOOLS: 1-1/8 in. deep well socket with l/2 in. drive
1/2 in. socket with 1/2 in. drive
11/16 in. combination box and open end wrench
1 in. combination box and open end wrench
1-1/8 in. combination box and open end wrench
Flat-tip screwdriver
Ratchet with l/2 in. drive
SPECIAL TOOLS Ground hop kit (Item 30, Chapter 3, Section 1)
Remove powerplant (page 5-2)
PRELIMINARY PROCEDURES:
Remove rear engine cooling fan (page 9-55)
REMOVAL:
1.
Using 11/16 inch wrench, disconnect hoses (A) and
(B) from connector (C).
TA107569
Go on to Sheet 2
6-101


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.