• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
THERMOSTATIC ENGINE OIL COOLER VALVE ASSEMBLY (LEFT AND RIGHT) REPLACEMENT (Sheet 4 of 4)
ENGINE OIL COOLER (LEFT AND RIGHT) REPLACEMENT (Sheet 2 of 6)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  57    58    59    60    61  62  63    64    65    66    67  
img
. . . . . . .
TM 5-5420-202-20-2
ENGINE OIL COOLER (LEFT AND RIGHT) REPLACEMENT (Sheet 1 of 6)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
6-19
Installation
6-22
TOOLS:
1/2 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
5 in. extension with 1/2 in. drive
9/16 in. combination box and open end wrench
3/4 in. combination box and open end wrench
1-1/2 in. combination box and open end wrench
Torque wrench with 3/8 in. drive, 0-200 lb-in (0-23 NZm) cap
3/4 in. socket with 3/8 in. drive
SPECIAL TOOLS: Ground hop kit (Item 31, Chapter 3, Section 1)
SUPPLIES
Washer
Drip pan
1/2 inch masking tape
(Item 58, Appendix D)
P l a s t i c barrier material
(Item 42, Appendix D)
Lubricating oil (Item 44, Appendix D)
Gaskets (2 required)
REFERENCES:
LO 5-5420-202-12
TM 5-5420-202-10
P R E L I M I N A R Y PROCEDURES:
Remove powerplant (page 5-2)
Remove engine shroud (page 9-30)
REMOVAL:
1. Using 1/2 inch socket, remove screw and
washer (A).
2. Using 3/4 inch wrench, loosen valve
(B) six complete turns.
6-19


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.