TM
5-5420-202-20-2
TUBE ASSEMBLY (FUEL INJECTION PUMP INLET TO BULKHEAD ELBOW)
REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Cleaning and Inspection
Installation
TOOLS: 5/16 in. combination box and open end wrench
3/4 in. combination box and open end wrench
7/8 in. combination box and open end wrench
1 in. combination box and open end wrench
Wire brush
3/8 in. socket with 3/8 in. drive
SPECIAL TOOLS:
Ground hop kit (Item 31, Chapter 3, Section I)
SUPPLIES:
Rags (Item 65, Appendix D)
Gloves (Item 69, Appendix D)
Drain pan
Goggles (Item 70, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
S e l f - l o c k i n g nuts
PRELIMINARY
PROCEDURES:
Go on to Sheet