• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR - Continued
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  507    508    509    510    511  512  513    514    515    516    517  
img
TM 5-5420-202-20-3
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR (Sheet 10 of 11)
7.
Position seal assembly (H) over shield
(J) with holes alined.
Position two flat washers (K) on seal
8.
assembly (H) with holes alined.
Using 7/16 inch socket, install five lock-
9.
washers (L) and screws (M) securing
seal assembly (H) and shield (J) to shield
(E).
Position new gasket (N) and spacer (P)
10.
on shield (B) with holes alined.
Using 7/16 inch socket, install four
11.
lockwashers (Q) and screws (R) through
spacer (P) and gasket (N) to shield (B).
Using grease gun, lubricate lever at grease
12.
fitting (S) with type GAA grease.
TA249316
Go on to Sheet 11
11-50


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.