• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFT LINKAGE ADJUSTMENT - Continued
SHIFT LINKAGE ADJUSTMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  511    512    513    514    515  516  517    518    519    520    521  
img
TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 3 of 28)
3.
At top of transmission, check position
of shifting position indicator (D). If
shifting position indicator (D) is
pointing to most forward dot (E), notify
support maintenance.
NOTE
Linkage is in adjustment, but transmission
malfunction is indicated.
If shifting position indicator (D) is not
pointing to most forward dot (E), go to step
127.
4.
At top of transmission using 9/16 inch wrench, remove screw (F) and remove shifting
rod bearing end (G) from clevis (H).
5.
At driver's station, move transmission
shift lever (A) to P position (B).
Go on to Sheet 4
TA249320
11-54


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.