• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR - Continued
SHIFT LINKAGE ADJUSTMENT

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  508    509    510    511    512  513  514    515    516    517    518  
img
. . .
TM 5-5420-202-20-3
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR (Sheet 11 of 11)
13.
Position cable (T) and clamp (U) on
hull wall.
14.
Using 7/16 inch combination wrench,
install screw (V) through clamp (U).
15.
Install shaft (W).
16.
Install powerplant (page 5-14).
17.
Adjust shifting controls and linkages (page 11-53).
Remove blocks from tracks (TM 5-5420-202-10).
18.
End of Task
TA249317
11-51


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.