• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFT LINKAGE ADJUSTMENT - Continued
SHIFT LINKAGE ADJUSTMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  525    526    527    528    529  530  531    532    533    534    535  
img
TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 17 of 28)
NOTE
Do not allow shifting rod (BB) to turn while doing
step 87. Shifting rod (BB) is made up of more than
one piece and may come apart if allowed to turn.
87.
Using 9/16 inch wrench, adjust shifting rod
bearing end (BF) by turning clockwise or
counterclockwise until screw (BG) will drop
freely through clevis (BH) and shifting rod
bearing end (BF).
FORWARD OUTBOARD
LINK ASSEMBLY
RIGHT REAR OF
ENGINE COMPARTMENT
88.
Using 9/16 inch wrench, install screw (BG).
89.
Holding rod
bearing end (BF) with 9/16 inch
wrench, use
torque wrench and 9/16 inch crow-
foot adapter
to tighten jamnut (AY) to 16-18
lb-ft (22-24
Nm).
Remove locating pin (AU) from alinement
90.
holes.
Using torque wrench and 9/16 inch socket,
91.
tighten screw (BG) to 16-18 lb-ft (22-24 Nm)
and go on to step 103.
TA249334
Go on to Sheet 18
11-68


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.