• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFT LINKAGE ADJUSTMENT - Continued
SHIFT LINKAGE ADJUSTMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  528    529    530    531    532  533  534    535    536    537    538  
img
TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 20 of 28)
103.
Using 9/16 inch wrench, remove two screws (BJ).
104.
Using fingers remove stud and rod end bearing
assembly (BK).
Using 6 inch rule, measure center to center
105.
distance between rod end holes. If measure-
ment is 5-3/4 inches, assembly is in adjust-
ment and go to step 120. If measurement is
not 5-3/4 inches, go on to step 106.
Using vise and 9/16 inch wrench, loosen
106.
jamnut (BL).
107.
Using vise and 9/16 inch wrench, turn rod
bearing end (BM) clockwise or counter-
clockwise  until  distance  between  centers
of rod bearing ends (BM) and (BN) measures
5-3/4 inches.
108.
Using small diameter wire, check to see if rod (BP) is past holes (BQ) and (BR). If rod (BP)
is past holes (BQ) and (BR), go on to step 109. If rod (BP) is not past hole (BQ), do steps
110 thru 114. If rod (BP) is not past hole (BR), go on to step 115.
Using vise, torque wrench, and 9/16 inch crowfoot adapter, tighten jamnut (BL) to
109.
16-18 lb-ft (22-24 Nm) while maintaining 5-3/4 inch measurement. Go on to step 120.
Go on to Sheet 21
TA249337
11-71


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.